1000 resultados para 090900 GEOMATIC ENGINEERING


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many of the teaching elements in Civil and Environmental Engineering and Spatial Science/Surveying are strongly related to multidisciplinary real-world situations. Professionals in each discipline commonly work collaboratively, knowing each other’s professional and technical limitations and requirements. Replication of such real-world situations allows students to gain an insight and acquire knowledge of professional practice for both civil engineering and spatial science disciplines. However, replication of an authentic design project is not always possible in a single unit basis where empirical project situations are often created with controlled sets of constraints, inputs and outputs. A cross-disciplinary design-based project that is designed to promote active student learning, engagement and professional integration would be the preferred option. The central aim of this collaborative project was to create positive and inclusive environments to promote engaging learning opportunities that cater for a range of learning styles with a two-way linkage involving third-year civil engineering and spatial science (surveying) students. This paper describes the cross-disciplinary project developed and delivered in 2010 and 2011. A survey was conducted at completion of the project to assess the degree of improvement in student engagement and their learning experiences. Improvements were assessed in a range of dimensions including student motivation, learning by cross-disciplinary collaboration and learning by authentic design project experiences. In this specific cross-disciplinary linkage project, the study findings showed that teaching approaches utilised have been effective in promoting active student learning and increasing engagement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Real‐time kinematic (RTK) GPS techniques have been extensively developed for applications including surveying, structural monitoring, and machine automation. Limitations of the existing RTK techniques that hinder their applications for geodynamics purposes are twofold: (1) the achievable RTK accuracy is on the level of a few centimeters and the uncertainty of vertical component is 1.5–2 times worse than those of horizontal components and (2) the RTK position uncertainty grows in proportional to the base‐torover distances. The key limiting factor behind the problems is the significant effect of residual tropospheric errors on the positioning solutions, especially on the highly correlated height component. This paper develops the geometry‐specified troposphere decorrelation strategy to achieve the subcentimeter kinematic positioning accuracy in all three components. The key is to set up a relative zenith tropospheric delay (RZTD) parameter to absorb the residual tropospheric effects and to solve the established model as an ill‐posed problem using the regularization method. In order to compute a reasonable regularization parameter to obtain an optimal regularized solution, the covariance matrix of positional parameters estimated without the RZTD parameter, which is characterized by observation geometry, is used to replace the quadratic matrix of their “true” values. As a result, the regularization parameter is adaptively computed with variation of observation geometry. The experiment results show that new method can efficiently alleviate the model’s ill condition and stabilize the solution from a single data epoch. Compared to the results from the conventional least squares method, the new method can improve the longrange RTK solution precision from several centimeters to the subcentimeter in all components. More significantly, the precision of the height component is even higher. Several geosciences applications that require subcentimeter real‐time solutions can largely benefit from the proposed approach, such as monitoring of earthquakes and large dams in real‐time, high‐precision GPS leveling and refinement of the vertical datum. In addition, the high‐resolution RZTD solutions can contribute to effective recovery of tropospheric slant path delays in order to establish a 4‐D troposphere tomography.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper outlines our literature review background, investigation and practical application utilizing a precise optical survey level and total station technology for a specialist industrial measurement application. The practical part of the project was to measure and check specific critical features of the Industrial JIG assembly table used by the Queensland University of Technology (QUT) Motorsport group. The JIG is used in constructing a new Formula SAE race-car frame each year and is used throughout the racing season to check the production frame for twists, bends and potential stresses. The industrial JIG table required two survey approaches, firstly determination of the overall flatness throughout its’ steel base surface. Secondly was the validation of verticality of the steel uprights used to support and hold the race-car frame in place during construction and checking alignment for key suspension components. In addition the investigation brings realisations that there are far more accurate, efficient and economical technologies to be harnessed in industrial metrology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract: Goals and potential impacts of QUT corporate Blueprint3 framework, university has made significant investments in physical infrastructure, and investments to improve staff profiles, particularly in relation to science, technology, engineering, and mathematics (STEM) disciplines. The most significant physical change to the Faculty’s infrastructure has seen new workshop and teaching and research spaces located in Science and Technology precinct under construction. Also includes Alumni news, input and output numbers Spatial Science discussion, Work Integrated Learning (WIL) in 2011, some key teaching administrative dates in 2011.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multiple awards for Spatial/Surveying lecturer, raising entry quality and commencing numbers at QUT, Gardens Point rapt in promise of things to come, STEM building progress.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Summary of Spatial Sciences (Surveying) Student Prize Ceremony were recently held at The Old Government House - QUT Cultural Precinct. This short industry article briefly outlines the 15 student award descriptions and some photos of 2011 recipients and thanks industry sponsors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry. Additionally Includes MAPMYTOWN 2010, Bell Darling Downs, summary of QUT contributions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many of the undergraduate and postgraduate programs of the former Faculty of Built Environment and Engineering PLUS Faculty of Sciences and Technology are changing as a result of merging these two large organisations, with some disciplines relocating to faculties of Creative Industries and Health respectively. The new STEM precinct under construction has begun rising from the proverbial hole-in-the-ground. Existing Surveying and Spatial Sciences programs, assets and staff are being repositioned with the newly formed School of Earth, Environment and Biological Sciences.2011. Golden graduates morning tea organised by QUT Alumni. Technology upgrades to the Mapping Sciences lab benefits 3-D learning experiences. Second and third-year students are undertaking Work Integrated Learning (WIL) over the summer vacation period. Final year students recently presented capstone project presentations at mini-conference in the Gibson Rooms overlooking a vibrant Southbank and sparkling Brisbane River. Discussion on end of year graduation ceremony held at QPAC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In spite of significant research in the development of efficient algorithms for three carrier ambiguity resolution, full performance potential of the additional frequency signals cannot be demonstrated effectively without actual triple frequency data. In addition, all the proposed algorithms showed their difficulties in reliable resolution of the medium-lane and narrow-lane ambiguities in different long-range scenarios. In this contribution, we will investigate the effects of various distance-dependent biases, identifying the tropospheric delay to be the key limitation for long-range three carrier ambiguity resolution. In order to achieve reliable ambiguity resolution in regional networks with the inter-station distances of hundreds of kilometers, a new geometry-free and ionosphere-free model is proposed to fix the integer ambiguities of the medium-lane or narrow-lane observables over just several minutes without distance constraint. Finally, the semi-simulation method is introduced to generate the third frequency signals from dual-frequency GPS data and experimentally demonstrate the research findings of this paper.